Projects & Clients

Text Box: -house ISA symbol libraries.

shared goals. mutual respect. expected results.

Other Industries

 

CONSOL ENERGY CENTER
Pittsburgh, PA

LEED certified facility was commissioned by Controls Link as Commissioning Agent.  We provided the commissioning plan, test criteria, and witness testing for this professional hockey arena in Pittsburgh.  This is the first sports arena that was LEED certified at any level and was certified silver level.

 

PITTSBURGH INTERNATIONAL AIRPORT
Pittsburgh, PA

FIDS system or flight information display was designed by Controls Link, Inc.  This system included over 300 thin client networks and several hundred drawings designing the electrical and mechanical system design showing all the monitors at this major airport.  

 

HEINZ
North Side Plant
Pittsburgh, PA

Software design linking Square-D PLC and Panelmate screens for the food process industry control. Implemented successful soup canning line automation. Project included PLC and screen debugging, programming, development and implementation.

 

CITY OF SAN DIEGO
Waste Water Treatment Plant
San Diego, CA

Developed and implemented MMI design of waste water treatment facility from third party P&IDs and mechanical drawings. Developed operator control philosophy and function of system with MMI viewpoint to assure easy operator interaction and proper control.

 

REXROTH
Environmental Monitoring System
Wooster, OH

Designed and installed Monitoring System to assure compliance with EPA clean water guidelines for system with heavy metals in ground water.

 

CONAIR
Plastic Pellet Conveying System
California, USA

Designed AB PLC with Winview MMI to control conveying system and injection molding system. Wrote control philosophies with user to assure capacity. Purchased equipment and assisted in construction.

 

LA WATER AUTHORITY
Los Angeles, CA

Designed 25 graphics from PID drawings and built graphics on WEStation graphics builder following graphics standards spelled out by CH2MHill. Checkout and Systems test work performed at staging site.

 

LA WATER AUTHORITY
Monolon Basin Project
Los Angeles, CA

Developed Westinghouse Loop drawings showing wiring from DCS to Marshalling Box and field instruments. Developed loop format and extracted wiring information from several hundred drawings to make approximately


Web controlslink.com